109478869174
Hello from London! The construction of Terminal 2 at Heathrow Airport is currently underway and in expected to be completed sometime in the 2020’s. Once it is finished, the new terminal will have capacity for 30 million passengers each year. Construction of Terminal 2 at Heathrow Airport London, England, UK 51.47278°N 0.48756°W www.overv.eu
Construction of Terminal 5 at Heathrow Airport
London, England, UK
51.47278°N 0.48756°W
Date posted: 2015/01/29 11:01:13
Date liked: 2015/01/29 19:01:11
25 Tumblr notes
Liked from: Daily Overview
Post tagged:
aerial view 342
aviation 149
infrastructure 113
top-down view 103
aircraft 75
runway 26
construction site 22
civil engineering 10
airport construction 1
airport expansion 1
Also: see similar
Date liked: 2015/01/29 19:01:11
25 Tumblr notes
Liked from: Daily Overview
Post tagged:
No tags
Automatically generated tags:aerial view 342
aviation 149
infrastructure 113
top-down view 103
aircraft 75
runway 26
construction site 22
civil engineering 10
airport construction 1
airport expansion 1
Also: see similar