109478869174
Hello from London! The construction of Terminal 2 at Heathrow Airport is currently underway and in expected to be completed sometime in the 2020’s. Once it is finished, the new terminal will have capacity for 30 million passengers each year. Construction of Terminal 2 at Heathrow Airport London, England, UK 51.47278°N 0.48756°W www.overv.eu
Construction of Terminal 5 at Heathrow Airport
London, England, UK
51.47278°N 0.48756°W
Date posted: 2015/01/29 11:01:13
Date liked: 2015/01/29 19:01:11
25 Tumblr notes
Liked from: Daily Overview
Post tagged:
aerial view 305
aviation 113
infrastructure 110
airplane 60
top-down view 58
construction site 22
runway 16
civil engineering 10
airport construction 1
airport expansion 1
Date liked: 2015/01/29 19:01:11
25 Tumblr notes
Liked from: Daily Overview
Post tagged:
No tags
Automatically generated tags:aerial view 305
aviation 113
infrastructure 110
airplane 60
top-down view 58
construction site 22
runway 16
civil engineering 10
airport construction 1
airport expansion 1