76267908160
After a little more than 2 years of removing 640,000 cubic yards of soil from our four block long site (equivalent to 120 Olympic sized swimming pools) we are happy to announce the completion of excavation at the Transbay Transit Center!
Digging for the new Transbay Terminal has been so extensive because it will eventually be the final subway stop for an electrified Caltrain and California High-Speed Rail.
Photo: thetransbayproject
Date posted: 2014/02/10 23:02:00
Date liked: 2014/02/10 23:02:04
4 Tumblr notes
Liked from: Muniverse
Original link: http://instagram.com/p/kP-hFuGMrR/
Tagged:
high speed rail 3
caltrain 2
transbay transit center 1
dtx 1
downtown extension 1
Date liked: 2014/02/10 23:02:04
4 Tumblr notes
Liked from: Muniverse
Original link: http://instagram.com/p/kP-hFuGMrR/
Tagged:
high speed rail 3
caltrain 2
transbay transit center 1
dtx 1
downtown extension 1