88381800789
6/10/2014
Channel Tunnel Entrance (French side)
Coquelles, France
Car loading ramps for the Eurotunnel train shuttle at the entrance to the Channel Tunnel in Coquelles, France. The tunnel spans 31.4 miles (50.5 km) and contains the longest undersea portion of any tunnel in the world at 23.5 miles (37.9 km). Construction began in 1988, was completed in 1994, and cost £4.650 billion (approximately $8 billion) to complete.
Date posted: 2014/06/10 16:06:00
Date liked: 2014/06/10 17:06:03
18 Tumblr notes
Liked from: Daily Overview
Post tagged:
aerial view 342
satellite imagery 129
infrastructure 113
logistics 89
industrial landscape 39
train tracks 7
transportation network 5
railway yard 3
transportation hub 2
railroad depot 1
Also: see similar
Date liked: 2014/06/10 17:06:03
18 Tumblr notes
Liked from: Daily Overview
Post tagged:
No tags
Automatically generated tags:aerial view 342
satellite imagery 129
infrastructure 113
logistics 89
industrial landscape 39
train tracks 7
transportation network 5
railway yard 3
transportation hub 2
railroad depot 1
Also: see similar