88381800789
6/10/2014
Channel Tunnel Entrance (French side)
Coquelles, France
Car loading ramps for the Eurotunnel train shuttle at the entrance to the Channel Tunnel in Coquelles, France. The tunnel spans 31.4 miles (50.5 km) and contains the longest undersea portion of any tunnel in the world at 23.5 miles (37.9 km). Construction began in 1988, was completed in 1994, and cost £4.650 billion (approximately $8 billion) to complete.
Date posted: 2014/06/10 16:06:00
Date liked: 2014/06/10 17:06:03
18 Tumblr notes
Liked from: Daily Overview
Post tagged:
aerial view 306
infrastructure 113
satellite imagery 107
logistics 81
industrial landscape 37
train tracks 7
transportation network 5
railway yard 3
transportation hub 2
railroad depot 1
Date liked: 2014/06/10 17:06:03
18 Tumblr notes
Liked from: Daily Overview
Post tagged:
No tags
Automatically generated tags:aerial view 306
infrastructure 113
satellite imagery 107
logistics 81
industrial landscape 37
train tracks 7
transportation network 5
railway yard 3
transportation hub 2
railroad depot 1